Difference between revisions of "ISO"

From IPEN Wiki
Jump to navigation Jump to search
Line 1: Line 1:
== Introduction ==
== Introduction ==


The objective of this page is to provide a high-level view of activities related to privacy standards in ISO, in particular in&nbsp;<span style="line-height: 1.6;">ISO/IEC JTC1/SC27/WG5. The convenor is Kai Rannenberg, and the vice convenor is Jan Schallaböck.</span>
The objective of this page is to provide a high-level view of activities related to privacy standards in ISO, in particular in&nbsp;<span style="line-height: 1.6;">'''ISO/IEC JTC1/SC27/WG5'''. The convenor is Kai Rannenberg, and the vice convenor is Jan Schallaböck.</span>


More info can be found in the following links:
More info can be found in the following links:
Line 22: Line 22:
*FDIS: Final Draft International Standard
*FDIS: Final Draft International Standard
*IS: International Standard</li>
*IS: International Standard</li>


*The steps that will lead to a technical report
*The steps that will lead to a technical report

Revision as of 15:39, 18 June 2015

Introduction

The objective of this page is to provide a high-level view of activities related to privacy standards in ISO, in particular in ISO/IEC JTC1/SC27/WG5. The convenor is Kai Rannenberg, and the vice convenor is Jan Schallaböck.

More info can be found in the following links:

Some conventions on ISO standards

The important things to know concerning ISO standards steps:

  • The steps that will lead to a standard
    • SP: Study period
    • NWIP: New Work Item Proposal
    • NP: New Work Item
    • WD: Working Draft
    • CD: Committee Draft
    • DIS: Draft International Standard
    • FDIS: Final Draft International Standard
    • IS: International Standard
    • The steps that will lead to a technical report
      • PDTR: Proposed Draft Technical Report
      • DTR: Draft Technical Report
      • TR: Technical Report
    • The steps that will lead to a technical specification
      • PDTS: Proposed Draft Technical Specification
      • DTS: Draft Technical Specification
      • Technical Specification
    • Progress is finalised every meeting (taking place every 6 months - in general October and May)