Difference between revisions of "ISO"

From IPEN Wiki
Jump to navigation Jump to search
Line 13: Line 13:
{| border="1" cellspacing="1" cellpadding="1" style="width: 500px;"
{| border="1" cellspacing="1" cellpadding="1" style="width: 500px;"
|-
|-
| <span style="line-height: 18.9090900421143px;">The steps that will lead to a standard</span><br/>
| <span style="line-height: 18.9090900421143px;">Standard</span><br/>
| <ul style="line-height: 18.9090900421143px;">
| <ul style="line-height: 18.9090900421143px;">
<li>SP: Study period</li>
<li>SP: Study period</li>
Line 26: Line 26:


|-
|-
| <span style="line-height: 20.7999992370605px;">The steps that will lead to a technical report</span><br/>
| <span style="line-height: 20.7999992370605px;">Technical report</span><br/>
| <ul style="line-height: 20.7999992370605px;">
| <ul style="line-height: 20.7999992370605px;">
<li>PDTR: Proposed Draft Technical Report</li>
<li>PDTR: Proposed Draft Technical Report</li>
Line 34: Line 34:


|-
|-
| <span style="line-height: 20.7999992370605px;">The steps that will lead to a technical specification</span><br/>
| <span style="line-height: 20.7999992370605px;">Technical specification</span><br/>
| <ul style="line-height: 20.7999992370605px;">
| <ul style="line-height: 20.7999992370605px;">
<li>PDTS:&nbsp;Proposed Draft Technical Specification</li>
<li>PDTS:&nbsp;Proposed Draft Technical Specification</li>
Line 43: Line 43:
|}
|}


Progress is finalised every meeting (taking place every 6 months - in general October and May)
Progress is finalised every meeting (taking place every 6 months - in general October and May). Here is a list of meetings that took place recently
 
 
 


{| border="1" cellspacing="1" cellpadding="1" style="width: 500px;"
|-
| 2014
| <br/>
|-
| 2015
| <br/>
|-
| 2016
| <br/>
|}


== Standards and Projects ==
== Standards and Projects ==
foo
foo

Revision as of 15:32, 18 June 2015

Introduction

The objective of this page is to provide a high-level view of activities related to privacy standards in ISO, in particular in ISO/IEC JTC1/SC27

More info can be found on in the SC27 portal (http://www.jtc1sc27.din.de/cmd?level=tpl-home&languageid=en). Note that the portal will in general contain more information that in this wiki.

The wiki focuses mainly on work carried out in  'ISO/IEC JTC1/SC27/'/WG5. The convenor is Kai Rannenberg, and the vice convenor is Jan Schallaböck.

Some conventions on ISO standards

The important things to know concerning ISO standards steps:

Standard
  • SP: Study period
  • NWIP: New Work Item Proposal
  • NP: New Work Item
  • WD: Working Draft
  • CD: Committee Draft
  • DIS: Draft International Standard
  • FDIS: Final Draft International Standard
  • IS: International Standard
Technical report
  • PDTR: Proposed Draft Technical Report
  • DTR: Draft Technical Report
  • TR: Technical Report
Technical specification
  • PDTS: Proposed Draft Technical Specification
  • DTS: Draft Technical Specification
  • Technical Specification

Progress is finalised every meeting (taking place every 6 months - in general October and May). Here is a list of meetings that took place recently

2014
2015
2016

Standards and Projects

foo